top of page

First Entry

Date:

Friday March 29th 2013
 

Number of days left:

Total Days Left: 51 (including weekends&holidays)
 

Class Periods Left: 20 periods
 

Work completed & tools used:

Today was the first day of the create stage, and my plan for today was to begin drawing my final drawing which later I am going to hand into Mr.  Thorburn to sign off. Fortunately my final design from the design stage was very detailed and included all of the aspects needed for the final drawing now in the create stage, so all I did was photo copy my drawing and have Mr. Thorburn sign it, which is what I did today.
 

Problems:

I did not come across any problems today that interfered with my work or any other subject area.
Am I keeping to my plan of action?

Yes I am keeping to my plan of action right now and ahead because I finished my final design early, allowing me to get a head start on things.
 

What I need to do next:

I need to begin manufacturing my actual clock, which includes measuring and cutting out the square, then measuring and drawing out the actual cupcake design, then cutting out the design very carefully, as well as filing and sand papering along the way to make my clock smooth and high quality.

bottom of page